5 images. Harbor negatives, 24 August 1953. Shows extensive work being done on extension of Pier "A" Long Beach; Navy landing at Long Beach; Eloi Amar (General Manager, Long Beach Harbor).; Supplementary material reads: "Chernus -- Harbor. Add to Harbor Series layout. Captions: #40: Shows extensive work being done on extension Pier A, Long Beach, which sticks out like a probing finger into the water at Long Beach. #41: Shows ships tied up at Pier A, Long Beach. #43: Shows long row of ships tied up at Pier A, Berth 9 and 10. #44: Shows Navy landing at Long Beach which will [be] moved shortly because of subsidence. #45: Shows Eloi Amar, general manager of Long Beach Harbor Department and guiding genius who planned and built the port that oil made possible. He is beside one of the 950 oil wells which stud the Long Beach harbor area. Alex C. Early Sunday. Ahead please".